Installation Time
Hey i get my car back in a couple of days and i'm getting a few things done to it. DV, Boost Controller, Test Pipe, and Exhaust. Does anyone know the approximate installation time for all this is? It'll all be done at a shop not DIY. Thanx
REally depends on the shop. The dv should be .5-1 hour depending on the shop. The other stuff will have varying degrees of customization. Id have to have the parts in front of me to see how much ill have to enginner my self and how much will bolt in factory style.
any good shop should be able to put a dv in an under 15mins, exhaust like mine is simple bolt on, and the test pipe would be cake with a lift, its just kinda hard with no lift lol but i did it
awesome so between ur exhaust and test pipe thats goin in my car and the dv it shouldn't take anymore than 1-2 hours. how bout the boost controller? (greddy profec B II)
I never wanted a boost controler never felt they were good enough, its kinda silly IMO to add boost with out more fule that could make it go lean and cause big bad problems so i never even looked at them with my set up
ORIGINAL: chaos92287
awesome so between ur exhaust and test pipe thats goin in my car and the dv it shouldn't take anymore than 1-2 hours. how bout the boost controller? (greddy profec B II)
awesome so between ur exhaust and test pipe thats goin in my car and the dv it shouldn't take anymore than 1-2 hours. how bout the boost controller? (greddy profec B II)
Thread
Thread Starter
Forum
Replies
Last Post
rsgore
New Member Welcome Area
0
Oct 9, 2009 09:16 AM
mschwister12
Audi A4
24
Jan 28, 2008 01:35 AM
ClemsonKev
South
13
Aug 11, 2006 08:06 PM



